• HOME
  • About us
    • Main business
    • Vission – Mission
  • Projects
    • The Northern region
    • Central region
  • Investment support
    • Investment Procedure
    • Guidance on Investment in Vietnam
    • Advantages
  • News
  • Recruitment
  • Tiếng Việt
  • English
  • 中文 (中国)
Liên hệ
PHUCLOC IDC
  • 0912528338(EN) | 0932288393(CN)
  • sales.phuclocidc@gmail.com
Contact us
PHUCLOC IDC
  • HOME
  • About us
    • Main business
    • Vission – Mission
  • Projects
    • The Northern region
    • Central region
  • Investment support
    • Investment Procedure
    • Guidance on Investment in Vietnam
    • Advantages
  • News
  • Recruitment
  • Tiếng Việt
  • English
  • 中文 (中国)
  • Home  /  
  • Phuc Son Industrial Park – Ninh Binh Province

Phuc Son Industrial Park – Ninh Binh Province

  • Overview
  • Location
  • Infrastructure
  • Investment Incentive
  • Album

Phuc Son Industral Park is attached with the Express highway 1B and access near the National Road No. 1A connecting from the North to the South. The internal routes inside Industral Park are planned in square pattern, facilitating the entering into building areas.

Location: Phuc Son Industrial Park, Ninh Son and Ninh Phuc Commune, Ninh Binh City, Ninh Binh Province, Vietnam

Scope: 129.4 ha (Vacant land: 5.9ha)

Operation period: Up to 28th April 2066.

Fields of investment appeal:
  • Manufacture of semiconductor production;
  • Manufacture of precision electronic and mechanical products;
  • Machine engineering production; automotive and motorbike production or assembling industry;
  • Construction high-tech materials production;
  • Manufacture of wooden, plastic and rubber products;
  • Consumer good production, food processing and pharmaceuticals;
  • And other kinds of production as approved by Ninh Binh Authority.

 

Location: Phuc Son Industrial Park, Ninh Son and Ninh Phuc Commune, Ninh Binh City, Ninh Binh Province, Vietnam

Distance from Phuc Son IP to significal locations:

  • 115 km far from Noi Bai International Airport.
  • 95 km far from Hanoi City – 1h10 by car.
  • 100 km far from Hai Phong Seaport – 2 hours by car
  • 98 km far from Nghi Son seaport (Thanh Hoa Province).
  • 5km far from center heart of Ninh Binh Province.
  • 3km far from Ninh Binh General Hospital, Ninh Binh Province
  • 2km far from Ninh Binh Railway Station.
  • 256 km far from Huu Nghi Port (Lang Son – China) 5h by car.
LAND CONDITION

Land is leveled and filled up with sand with compaction K>=0.9. Ready for construction.

INTERNAL ROADS

The traffic roads inside Industrial Park are planned in square pattern, convenient to access to each land lot. + Main road: 36 m in width. + Branch road: 17.5 m and 13.5m in width. Lighting system is equipped alongside all the roads.

POWER SUPPLY

Two Sub-stations of 110/35kV – 40 MVA; 63,000 KVA per one. The electricity will be supplied to the land border of all tenants and will be increased to meet the consumption of investors. The IP commits to supply enough electricity for enterprises when the demand increased. Electricity fee will be regulated by EVN Ninh Binh.

WATER SUPPLY

Water supply plant will has been operated with capacity of 20,000 m3/ day. Water supply capacity may increase to meet consumption demand of enterprises. Rainwater and wastewater drainage systems are separately built.

WASTEWATER TREATMENT

Wastewater processing plant has been built with current capacity of First Phase 1,200 m3/day and night. The wastewater treatment capacity may increase to meet consumption demand of enterprises.

TELE-COMMUNICATION

The modern and international standardized telecommunication system is always available for communication demand, high and stable data transmission speed and domestic and local communication service.

Corporate Income Tax (CIT): 

Exemption within first 2 years and deduction 50% within 4 following years from the first year of investment project in revenue.

Land Use Tax: This tax will be exempted up to 28th April 2031.

 

 

 

Exemption of Export-Import Tariff:

+ Exemption of import duties on imported goods to create fixed assets.

+ Exemption from import duties on raw materials, supplies and components for a period of 5 years.

Phối cảnh Nhà máy Vienergy, KCN Phúc Sơn
LOGO Daewon
  1. Phối cảnh Nhà máy Vienergy, KCN Phúc Sơn
  2. LOGO Daewon

PHUCLOC IDC

  • Lot C2, Khanh Phu Industrial Park, Ninh Phuc Commune, Ninh Binh City, Ninh Binh Province
  • F4 CIENCO 8 Building, No. 18 Ho Dac Di Rd., Dong Da Dist., Hanoi, Vietnam
  • (+84)912528338 (for English language)
    (+84)932288393 (for Chinese language)
  • tracy.nguyenpt@gmail.com
    quynhtrang2908@gmail.com

WORK TIME

  • 08h00 - 17h00
  • Vacation

PHUCLOC IDC All rights reserved. Designed Developed by SaoKim Digital