• HOME
  • About us
    • Main business
    • Vission – Mission
  • Projects
    • The Northern region
    • Central region
  • Investment support
    • Investment Procedure
    • Guidance on Investment in Vietnam
    • Advantages
  • News
  • Recruitment
  • Tiếng Việt
  • English
  • 中文 (中国)
Liên hệ
PHUCLOC IDC
  • 0912528338(EN) | 0932288393(CN)
  • sales.phuclocidc@gmail.com
Contact us
PHUCLOC IDC
  • HOME
  • About us
    • Main business
    • Vission – Mission
  • Projects
    • The Northern region
    • Central region
  • Investment support
    • Investment Procedure
    • Guidance on Investment in Vietnam
    • Advantages
  • News
  • Recruitment
  • Tiếng Việt
  • English
  • 中文 (中国)
  • Home  /  
  • TAM DIEP 2 INDUSTRIAL PARK – Ninh Binh Province

TAM DIEP 2 INDUSTRIAL PARK – Ninh Binh Province

  • Overview
  • Location
  • Infrastructure
  • Investment Incentive
  • Album

SCOPE: 386HA

Operation period: Up to 2075.

Fields of investment appeal:
  • Manufacture of semiconductor production;
  • Manufacture of precision electronic and mechanical products;
  • Machine engineering production; automotive and motorbike production or assembling industry;
  • Construction high-tech materials production;
  • Manufacture of wooden, plastic and rubber products;
  • Consumer good production, food processing and pharmaceuticals;
  • And other kinds of production as approved by Ninh Binh Authority.

Location: Tam Diep 2 Industrial Park, Quang Son Commune, Ninh Binh Province, Vietnam

Distance from Tam Diep 2 IP to significal locations:

  • 135 km far from Noi Bai International Airport.
  • 110 km far from Hanoi City – 1h10 by car.
  • 115 km far from Hai Phong Seaport – 2 hours by car
  • 82 km far from Nghi Son seaport (Thanh Hoa Province).
  • 15km far from center heart of Ninh Binh Province.
  • 15km far from Ninh Binh Railway Station.
  • 270 km far from Huu Nghi Port (Lang Son – China).
LAND CONDITION

Land is leveled and filled up, ready for investors

INTERNAL TRAFFIC

The roads inside IP are planned in square pattern and spread asphalt with heavy loading to ensure favourable transportation to each land lot.

POWER SUPPLY

Power is supplied from the national grid through 110/22kv (35kv) transformer station with capacity 63MVA. Supply enough electricity for enterprises when the demand increased.

WATER SUPPLY AND DRAINAGE SYSTEMS

Water supply plant will be operated with capacity of 7,000 m3/ day. Water supply capacity may increase to meet consumption demand of enterprises. Rainwater and wastewater drainage systems are separately built underground and located along the routes in the sidewalks.

WASTEWATER TREATMENT

The wastewater treatment plan with total capacity: 5,500m3/day and night, in which the first phase 1,200 m3/day and night. The wastewater treatment capacity will be increased to meet the consumption of investors.

TELECOMMUNICATION

The modern and international standardized telecommunication system is always available for communication demand, high and stable data transmission speed and domestic and local communication service.

Corporate Income Tax (CIT):  Exemption within first 2 years and deduction 50% within 4 following years from the first year of investment project in revenue.

Land Use Tax: This tax will be exempted in accordance with Government's regulations.

Exemption of Export-Import Tariff: Exemption and deduction of import, export tax will be regulated in accordance with Government's regulations

LOGO Daewon
  1. LOGO Daewon

PHUCLOC IDC

  • Lot C2, Khanh Phu Industrial Park, Ninh Phuc Commune, Ninh Binh City, Ninh Binh Province
  • F4 CIENCO 8 Building, No. 18 Ho Dac Di Rd., Dong Da Dist., Hanoi, Vietnam
  • (+84)912528338 (for English language)
    (+84)932288393 (for Chinese language)
  • tracy.nguyenpt@gmail.com
    quynhtrang2908@gmail.com

WORK TIME

  • 08h00 - 17h00
  • Vacation

PHUCLOC IDC All rights reserved. Designed Developed by SaoKim Digital